
Thursday, June 3, 2010
Summer Mode!

Sunday, May 23, 2010
Summer Crew, Assemble!
After tying off our loose ends at the various parks we'd worked at, Trail Crew spent two weeks at the Polk City Shop, preparing ourselves and our equipment for the trials/trails of the coming summer. This was mostly manual labor, as we cleaned and sorted our tools, equipment and vehicles. However Trail Crew is much more than a simple labor crew, and there was a great deal of preparation to be made in order to maintain this standard. Educational presentations were prepared by all of us in order to introduce the new crew to our bio-diesel program, ADA (Americans with Disabilities Act) trail construction, environmental ethics and even healthy and sustainable eating.
Troy, Ty and Tim enjoy a campfire on our first morning.On the morning of May 17th, the entire crew assembled for the first time. After setting up camp at Massey Marina and making introductions, we brought everyone to the Mines of Spain Interpretive Center for our favorite (yeah right) job ever: paper work. This took up most of the morning, and after lunch we made our first presentations. These were about the program's history and basic trail techniques. This then lead into our first hike, lead by myself, Adam and a veteran of last year's Trail Crew: Troy Heeren. As we hiked the various trails at the Mines of Spain, we pointed out the various problems and the implemented solutions.
This was not only a learning experience for the new Summer Crew members, but also for those of us leading the hike. Teaching is often the best way to learn, particularly when teaching those who are entirely inexperienced because they often have a fresh and novel perspective of the material. Their questions often challenge you to not take anything for granted, and can also cause you to question aspects of your work you had never even fully considered. This made Monday a very enriching experience for everyone.
Tuesday was spent with more presentations, followed by our first real project (and VGP): the completion and maintenance of the trail to Ice Cave at Pictured Rocks Park in Jones County. This was the site of work for several generations of Trail Crew, including us. The limestone terrace we built last fall has held up quite well (with the help of the Jones County Conservation Office) and Pictured Rocks Park itself has gone through a major overhaul. It was good to return to the site of our earlier work, and to assess it with the new perspectives we've developed after months of experience working on various other projects. Overall we were proud of our work, and glad to return to provide some finishing touches.
The Crew assembles on the stone terrace we built last fall.Our primary project was extending our trail to the newly completed picnic shelter. We also provided some minor maintenance to the trail where it needed it (mostly filling in eroded portions), closed off a section of the old trail that is no longer in service, and transplanted a number of local plants onto a section of heavily disturbed soil that needed to be restored. This was a hefty load for the new Summer Crew, but they took everything in eager stride and performed admirably. We also had the assistance of two volunteers. A special thanks goes out to Professor Charles Frohman and his son for joining us on the trail!
Crew members and a volunteer work to extend the trail to the picnic shelter.
Delilah and Molly haul rock out to a section of trail that needs attention.
Adam, Elizabeth and Shirley transplant various species of plants to the section of bare soil.
The whole crew assembles after a job well done!Wednesday and Thursday consisted of a mix of presentations and various projects. Our primary work was on a damaged stairway at the Horseshoe Bluff at the Mines of Spain. It is a harsh reality that a construction project that takes days, weeks or months can be deconstructed in moments. This is a reality that Trail Crew has to face on a frequent basis. While it is most often nature that inflicts the damage and wear on our projects, careless and malicious people are often the source of our most significant problems. In the case of this stairway, various welds and boards were broken by persons who found entertainment in dropping large stones off the bluff. Frustrating as such activity is, we can't allow ourselves to be demoralized by such carelessness. Instead we press on, doing our best to repair the damage and prevent such problems from occurring in the future.
Overall it was a busy, tough and taxing week. But it was also fun, enriching and exciting. The next few months promise more of all of the above, and Trail Crew is eager for it!
Thursday, May 6, 2010
Tuesday, May 4, 2010
Adios, Green Valley!
- Cleaned out the Gater house and yard
- Picked up trash around the park
- Demolished two old sheds/hog houses
- Finished building, insulated, sided and roofed a new cabin
- Installed/repaired a stone drainage area around all three cabins
- Graded the area around the new cabin
- Planted grass around all three cabins
- Cleaned up around the newly-renovated campsites
- Installed ADA walkways to the new cabin and four new concrete restroom buildings
- Built, insulated, sided and roofed a check-in stand for the campground
Sunday, April 18, 2010
Spring Cleaning
The bulk of our time has been spent with shovels and chisels in hand, as we installed new rock borders around each of
Adam and Ceith break ground to install a new limestone border.
Our limestone border in place and properly aligned.
The rest of our time at Green Valley was spent working on various miscellaneous projects, such as cleaning and touching up the cabin interiors, cleaning the house we've been staying in, minor maintenance on the facilities of the park, and cutting down cedar trees to be used in another project (more on that later). However we have more preparatory work to do beyond tying up our loose ends. In order to be effective leaders this summer, we must have a solid understanding of the methods Trail Crew employs on the trails, and the ability to efficiently coordinate a sizeable team of people with varying levels of experience.
Delilah and Ceith detail a cabin by staining the interior.
Delilah drags the freshly felled tree to the limb pile...
...Where Ceith cuts off the limbs...
...And then loads the log onto our truck for transport!
Always trying to be efficient, we stationed ourselves at
Adam mixes mortar for our stone pillars.
Members of the corrections crew use the mortar to build the stone pillar.
A finished stone pillar, ready to be attached to the process cedar logs we brought from Green Valley.While touring trails we explored the various problems that trails can face as well as the potential solutions. The most common problem is erosion of a trail due to a combination of rain water and heavy usage. This can not only make a trail difficult or uncomfortable to use, it can also make them dangerous. It also makes them aesthetically unappealing and disruptive to the natural experience that most hikers are looking for on the trail. Luckily there are many solutions to the problem of erosion.
The first and best solution is preventative: construct the trail so that water sheds off the trail easily and evenly so that ruts and gullies don’t form and channel even more water. It is a simple fact of physics that water will follow the path of least resistance, and so a trail must be constructed with the natural terrain in mind so that water will “choose” to travel across the surrounding terrain rather than the trail itself. Constructing the trail grade so that it is shallow in relation to the natural terrain is the best way to accomplish this, as a steeper grade provides less resistance to water flow.
Unfortunately it is difficult to predict the behavior of water on a trail as it being created, so post-construction solutions are often required. These include (but aren’t limited to) rolling dips, water bars and culverts. Rolling dips are gradual undulations in the trail’s grade that cause water to shed off the trail (as it can’t travel uphill). Water bars are physical objects (such as railroad ties) that are buried under the trail to elevate its surface, thereby creating mini dams that push water off the trail. Culverts are a situational solution, serving as a conduit for water to travel through under a trail. Unfortunately this also causes water to concentrate in a small area, and can cause erosion problems downhill if they aren’t installed conscientiously.
With the summer hiring process coming to a close, Trail Crew has plenty more preparations to make and our real work has just begun. Bringing in the summer team is only going to increase Trail Crew’s workload, and that means more to report here! So expect even more exciting updates as we begin to move into summer. Happy Spring everyone!
Thursday, March 25, 2010
Green Valley Continued...



Sunday, March 7, 2010
Green Valley Cabin
The first step was the interior. Fiberglass insulation and a vapor barrier help to ensure that the cabin is weatherized and energy efficient. After applying these, we finished the walls with tongue and groove siding, cut to fit each wall individually. Doing so was a complicated affair with a steep learning curve, but we quickly learned to mind all of the many details associated with trimming a board to have a tight and level fit that was aligned with the boards on the adjoining walls. We also learned to "blind nail" each piece, a technique that hides the nails in the joints of the siding so that the final product is unblemished wood.



After Ceith cuts a piece of siding, Adam blind nails it to the wall. The before and after can be seen on the final photo.
After mounting a mantle above the heating unit, applying the siding to the walls and vaulted ceiling and providing trim to the windows, we moved to the exterior. Siding was again individually cut from stock, this time from log siding that gave the cabin a rustic aesthetic. We also applied drip edges, shingles and vents to prevent moisture from rotting the wood, thereby ensuring that the cabin will stand the test of time.



Adam Delilah and Ceith raise a piece of external siding. After that was finished, everyone moved on to roofing for a day.
Though the bulk of the work is now finished, we still have details to finish on this project. All of those loose ends will hopefully be tied up next week, allowing us to move on to what will hopefully be our first project of spring (is it spring yet? please?). More on the Green Valley cabin, as well as pictures of the final product to come soon!
























